What We Do

Services

Everything we build, fix, and maintain, from a first-time deck to one that's been patched together for years.

Home › Services

Everything we take on

Every job below is one we do ourselves across Palatine.

Deck Installation

We frame and build new decks from the footings up, sized for pressure-treated lumber, cedar or composite decking. Footings go below the frost line and joists are spaced to match whatever decking material you choose.

Custom Deck Design

We draw out multi-level decks, built-in benches, stair layouts and railing styles before any wood gets ordered. You see the footprint and the material list up front, so there's no guessing at the final price.

Deck Repair

Bouncy boards, a railing that's come loose from its post, a ledger board that's started to rot where it meets the house, we deal with all of it. Sometimes it's a few boards, sometimes the whole frame underneath needs rebuilding.

Deck Staining & Sealing

We power wash the deck first, let it dry, then stain and seal the boards including the end grain, which is where most water gets in. A deck left unsealed in this climate starts graying and cupping within a couple of seasons.

Composite Decking Installation

Composite boards like Trex or TimberTech don't rot or splinter, but they still require the frame underneath built correctly and the boards spaced for drainage. We install hidden fastener systems so you don't see a single screw head on the surface.

Deck Railing Repair & Installation

Railings have to meet a 36 to 42 inch height code depending on your township, and baluster spacing has to keep a 4 inch sphere from passing through. We replace loose posts, wobbly rail caps and anything that wouldn't pass an inspection.

Deck Resurfacing

If the frame is solid but the boards are cupped, gray or splintering, we strip the old decking and install new boards on the existing structure. It's a faster way to get a deck looking new without rebuilding what's underneath.

Deck Demolition & Removal

Old decks get pulled up, boards and framing hauled off, and the yard swept for nails and screws before we leave. This is also when we usually find out if the posts or ledger board were ever set up right in the first place.

Pergolas & Shade Structures

We build pergolas and shade structures that attach to or sit beside an existing deck, sized to carry snow load through an Illinois winter. Most people add these once they realize the deck gets too much afternoon sun to actually sit on.

Screened-In Porch Construction

For homeowners who want to sit outside without the mosquitoes, we build screened porches onto an existing deck or as part of a new one. It's a bigger structural job than a basic deck, since you're adding a roof load the frame has to support.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Palatine, IL

Deck construction and repair across the northwest Chicago suburbs.

Palatine, IL
Elgin, IL
Schaumburg, IL
Arlington Heights, IL
Des Plaines, IL
Hoffman Estates, IL
Mount Prospect, IL
Buffalo Grove, IL
Crystal Lake, IL
Wheeling, IL
Rolling Meadows, IL
Barrington, IL
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck in Illinois?
Most Illinois municipalities require a permit for any deck higher than 30 inches off the ground, and some require one regardless of height. Permits typically involve a footing inspection before backfilling and a final inspection once the deck is complete.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from the first footing to the final board, weather and permit timing included. Multi-level decks, screened porches, or decks with extensive custom railing take longer.
Can a deck be built on a budget without cutting corners on safety?
Pressure-treated lumber keeps material costs down while still meeting the same footing depth, joist spacing, and railing height requirements as a composite deck. Budget decks usually save money on decking material and railing style rather than on the structural framing underneath.
What kind of warranty comes with a new deck?
Workmanship is typically covered under a separate warranty from the materials themselves, since decking manufacturers like Trex and TimberTech carry their own product warranties, often 25 years or more against fading and staining. Workmanship warranty length and terms should be spelled out in the written quote before work starts.
Who do I talk to during the project if I have questions?
A single point of contact, usually the crew lead or project manager, handles day-to-day questions once a deck project is underway. This avoids the common problem of a homeowner getting different answers from different people.
What's the difference between pressure-treated lumber, cedar, and composite decking?
Pressure-treated lumber is the cheapest option but requires staining every two to three years to prevent graying and cracking. Cedar costs more and weathers more naturally but still requires periodic sealing, while composite decking costs the most upfront but requires no staining and resists rot and splintering.
Can I still use my yard while the deck is being built?
Most of the yard remains usable during deck construction, though the immediate work area has to stay clear of furniture, toys, and pets for safety. Access for equipment and material delivery is usually required along one path to the backyard.
What should I do to prepare my yard before deck construction starts?
Clearing furniture, grills, and planters away from the work area is the main preparation required before deck construction begins. Marking the location of any underground sprinkler lines or buried utilities ahead of time also helps avoid delays.
What happens if you find rot or damage once the old deck comes off?
Hidden rot in the ledger board, rim joist, or posts is common once an old deck is removed, especially around the point where the deck meets the house. Any additional repair gets priced separately and explained before work continues, rather than being a surprise on the final bill.
How should a new deck be maintained after it's finished?
Pressure-treated and cedar decks require re-staining roughly every two to three years, along with yearly cleaning to clear debris from between the boards. Composite decking requires only occasional washing, but all decks benefit from keeping leaves and debris from piling up against the house where the ledger board attaches.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (847) 393-0458